
FERNÁNDEZ VAGLIO · CONSTRUCTION SOLUTIONS
Auger boring
A trenchless alternative for pipe crossings.
Ask about your project →Auger boring combines drilling with spoil removal by a rotating auger. It allows a casing or pipeline to be installed from a working shaft towards a reception point.
Crossing assessment
The alignment, ground conditions, crossing length and installation tolerances determine whether this method is suitable. Access and available working space are also assessed.
Construction with less surface disturbance
Installation is concentrated at the working points at each end, avoiding continuous open excavation along the route.
A solution within our range of services
Fernández Vaglio combines auger boring with other trenchless technologies to select the appropriate construction method for each project.
Our experience in photographs
Let's discuss your project
Head office in Costa Rica. Presence in Panama and El Salvador.
Request information →



