01 / Electrical infrastructure

Tocumen II power supply

Design and construction of 5.6 km of underground 115 kV line to supply power to the Tocumen II terminal, with 750 mm conduits installed using horizontal directional drilling (HDD).

Drilling rig and support equipment on the Tocumen II power supply worksConduits installed during the Tocumen II works

Project photographs · Select an image to enlarge it.

02 / Sanitation

Juan Díaz River basin collectors

Design and construction of collectors in the Juan Díaz River basin and associated works, as part of the Panama City and Bay Sanitation Project (CO-SCBP-01-2014).

Personnel and equipment in a working shaft for the Juan Díaz collectorsWork site for the Juan Díaz River basin collectors

Project photographs · Select an image to enlarge it.

03 / Underwater crossing

Crossing beneath Lake Alajuela

Installation of 350 metres of 300 mm HDPE pipe using horizontal directional drilling for a crossing beneath Lake Alajuela in Chilibre, Panama.

Pipe preparation and support crew beside Lake AlajuelaView of Lake Alajuela during the underwater crossing works

Project photographs · Select an image to enlarge it.

04 / Electrical infrastructure

Gas Natural del Atlántico Plant

Design and construction of 8 km of underground 230 kV line for the Gas Natural del Atlántico Plant (GANA), with 750 mm conduits installed using horizontal directional drilling.

Drilling equipment at the Gas Natural del Atlántico Plant worksDrill rods and working area for the GANA underground line project

Project photographs · Select an image to enlarge it.

05 / Electrical infrastructure

Costa del Este electrical network reinforcement

Installation of 1 km of underground 115 kV line with 750 mm diameter conduits and associated works to reinforce the electrical network in Costa del Este.

Vermeer drilling rig at the Costa del Este electrical network worksEquipment working in the urban environment of Costa del Este

Project photographs · Select an image to enlarge it.

06 / Electrical infrastructure

Line relocation for the Panama Metro

Design and construction of the relocation of 900 metres of underground 115 kV lines, with 750 mm conduits installed using horizontal directional drilling, between Brisas del Golf and the Cerro Viento substation.

Aerial view of the work site for line relocation for the Panama MetroDrilling rig and support equipment during electrical line relocation

Project photographs · Select an image to enlarge it.

07 / Sanitation and distribution networks

Chorrillo and Santa Ana networks

Improvements to the distribution and sewerage networks in Chorrillo and Santa Ana. The scope included 620 metres of 600 mm wastewater pressure main installed using HDD, connections to existing systems, and 1,300 metres of 750 mm pipe installed by open-cut excavation.

Drilling equipment for the Chorrillo and Santa Ana networksDistribution and sewerage network works in Chorrillo and Santa Ana

Project photographs · Select an image to enlarge it.